Skip to main content
You have permission to edit this article.
Edit
Legal notices: April 27, 2021

Legal notices: April 27, 2021

  • 0
{{featured_button_text}}

 

NOTICE OF MEETING

NEBRASKA CRAFT BREWERY

BOARD MEETING

 

Notice is hereby given that the

Nebraska Craft Brewery Board will

hold a meeting on May 13th at 1:00

p.m. (CDT) at the Nebraska Depart-

ment of Agriculture, 301 Centennial

Mall South, Lincoln, Nebraska. An-

yone wishing to attend the meeting

remotely may do so by gong to

https://tinyurl.com/5132021. The

Meeting Password is 2021. The

purpose of the meeting is to dis-

cuss issues relating to Nebraska's

craft brewery industry. An agenda

is available for public inspection in

the offices of the Nebraska Depart-

ment of Agriculture during normal

business hours.

ZNEZ A27,t1

 

Parker, Grossart & Bahensky,

L.L.P.

NOTICE OF ORGANIZATION

OF

MATTIE & TILLY, L.L.C.

A Nebraska Limited Liability

Company

 

Notice is hereby given that Mattie

& Tilly, L.L.C., a Nebraska Limited

Liability Company, has been organ-

ized under the laws of the State of

Nebraska. The street mailing ad-

dress of the Company's initial des-

ignated office is 1516 1st Avenue,

Kearney, Nebraska 68847. The ini-

tial agent for service of process of

the Company is Jack W. Besse,

1516 lst Avenue, P.O. Box 1600,

Kearney, Nebraska 68848.

ZNEZ A20,A27,My4

 

NOTICE OF SPECIAL MEETING

VILLAGE OF ELM CREEK,

NEBRASKA

 

NOTICE IS HEREBY GIVEN, that

a special meeting of the Chairman

and Board of Trustees of the Vil-

lage of Elm Creek, Nebraska, will

be held at 5:30 o'clock P.M. on

Tuesday, May 4, 2021, at Elm

Creek Village Center which meeting

will be open to the public. An

agenda for such meeting, kept con-

tinuously current, is available for

public inspection at the office of

the Village Clerk at the Village Hall.

Social distancing for officials,

staff, and the public will be in ef-

fect.

Village Clerk

ZNEZ A27,t1

 

CENTRAL COMMUNITY

COLLEGE - GRAND ISLAND

ROOF REPLACEMENT

INSTRUCTIONS TO BIDDERS

INVITATION

1.01 BID SUBMISSION

A. Bids signed and under seal,

executed, dated, and submitted for

the furnishing of all labor, materials,

and equipment for the Central

Community College - Grand Island,

Roof Replacement prior to:

1. Date: May 5, 2021.

2. Time: 2:00 p.m.

3. Place: Central Community Col-

lege, Grand Island, College Admin-

istration, Board Room 80.

4. Location: 3134 West Highway

34, Grand Island, Nebraska 68802.

B. Offers will be opened publicly

immediately after the time for re-

ceipt of bids. The Owner will con-

sider the bids received for the fur-

nishing of said labor, materials and

equipment necessary for the proper

construction of the aforesaid proj-

ect.

C. The General, Mechanical and

Electrical, will be under one Bid. All

subcontractor quotations shall be

sent to the General Contractor.

D. Bid Security is required to be

submitted with bid proposal form.

Make payable to Central Commu-

nity College in the amount of 5% of

the Lump Sum Bid Amount. Bid

Security shall be of cashiers check,

certified check, or Bid Bond issued

by a Surety licensed to conduct

business in the State of Nebraska.

Form of Bid Bond is AIA Document

A310. Any agent signing a bid bond

on behalf of the Surety must attach

a Power of Attorney effectively evi-

dencing the agent's authority to

bind the Surety to the performance

of the Bid Bond.

E. Performance Bond: The Con-

tractor shall be required to furnish

acceptable bonds to complete the

work and pay for all labor and ma-

terials used, said bonds to be in the

amount of 100% of total amount of

the Contract. See Document A701,

Instructions to Bidders.

F. Taxes: The Contractor by vir-

tue of his contract with Central

Community College, becomes a

purchasing agent for the Owner on

their behalf and under Statute

77-2702 does not pay sales tax.

G. Insurance: Prior to the start of

the work, completed copies of the

Certificate of Insurance, AIA Docu-

ment G705 shall be submitted to

the Owner and Architect.

H. There is no Pre-Bid Confer-

ence schedule. Contact Rob

Briseno, Facilities Manager Grand

Island Campus, email:

rbriseno@cccneb.edu; phone:

308-398-7450, to schedule a visit

and view existing conditions.

1.02 PROJECT SUMMARY

A. Project Name: Central Com-

munity College - Grand Island,

Roof Replacement

B. Project Address: 3134 West

Highway 34, Grand Island, Ne-

braska 68802.

C. Owner's Name: Central Com-

munity College

D. Architect's Name: Wilkins Ar-

chitecture Design Planning, L.L.C..

E. The Contract Documents,

dated April 14, 2021 prepared for

the project by Wilkins Architecture

Design Planning, L.L.C.

F. The work consists of replacing

the low-slope roof with EPDM sin-

gle-ply roofing membrane with ad-

ditional polyisocyanurate insulation

layers. Project also includes coor-

dination of existing RTU and duct-

work, all associated flashing and

perimeter cap flashing.

1.03 CONTRACT DESCRIP-

TION

A. Contract Type: A single prime

contract based on a Stipulated

Price as described in Document 00

5200 - Agreement Form.

B. Project will be constructed un-

der one general construction con-

tract.

1.04 OWNER OCCUPANCY

A. Owner intends to occupy the

Project upon Substantial Comple-

tion.

B. Schedule the Work to accom-

modate Owner occupancy.

1.05 CONTRACT TIME

A. The bidder, in submitting an

offer, accepts the Contract Time

period stated for performing the

Work. The completion date in the

Agreement shall be the Contract

Time added to the commencement

date.

1.06 WORK SEQUENCE

A. ALL WORK MUST BE COM-

PLETED WITHIN THE SCHEDULE

NOTED. The Work shall be con-

ducted in a single phase as de-

scribed in the schedule below:

B. May 5, 2021: Bids received

from General Contractors at 2:00

p.m.

TBD: Contractors interviews in

CCC Board Room.

May 20, 2021: Contractor recom-

mendation presented to Board of

Governors.

May 24, 2021: Contract

awarded: Start Digital Document

Submittal Service (ORACLE, Sub-

mittal Exchange) and Administra-

tive Requirements.

June 1, 2021: Construction Starts

July 9, 2021: Substantial Com-

pletion.

July 16, 2021: Final Completion.

BID DOCUMENTS AND

CONTRACT DOCUMENTS

2.01 DEFINITIONS

A. Bid Documents: Contract Doc-

uments including Project Manual,

Construction Drawings and all is-

sued Addendums.

2.02 AVAILABILITY

A. Bid Documents may be ob-

tained from the following location:

1. Standard Digital Imaging, 4424

S 108th St, Omaha, NE 68137 (402)

592-1292.

B. Bid Document Information can

be obtained online from the follow-

ing location:

1. Standard Digital Imaging |

Standard Share; www.stan-

dardsharev3.com. The following in-

formation can be obtained and

viewed:

a. Instructions to Bidders

b. Bid Form

c. Specifications Table of Con-

tents

d. Section 01 1000 Summary

e. Addendums

f. Construction Drawing Images

IMAGES ARE NOT FOR

BIDDING - FOR REFERENCE

ONLY IN ORDERING

C. A deposit in the amount of

$50.00 (made payable to Wilkins

Architecture Design Planning,

L.L.C.) will be required for each set

of bidding documents. If shipping

is required there is a non-refund-

able amount determined and made

payable to Standard Digital Imag-

ing These checks are to be sent to

Standard Digital Imaging prior to

receipt of documents. The deposit

will be returned in full only if a qual-

ified bid is submitted and the Bid

Documents are returned within fif-

teen (15) days of the bid determina-

tion, or if the Contractor decides

not to submit a Proposal and the

Bid Documents are returned with

seven (7) days prior to the bid

opening.

D. ALL BID DOCUMENTS

SHALL BE RETURNED to the of-

fice of Wilkins Architecture De-

sign Planning, L.L.C., 2908 West

39th Street, Suite A, Kearney,

Nebraska, 68845.

2.03 EXAMINATION

A. Bid Documents may be exam-

ined at:

Lincoln Builders Bureau, 5910 S.

58th Suite #C, Lincoln, NE 68516.

Omaha Builders Exchange, 4255

S 94th St., Omaha, NE 68127.

Columbus Area Chamber of

Commerce, 753 33rd Ave., Colum-

bus, NE 68602-0515.

Hastings Builders Bureau, 301

South Burlington, Hastings, NE

68902.

Builders Plan Service, 309 West

2nd, Grand Island, NE 68801.

Reed Construction Data, 30

Technology Drive So. Suite 500,

Norcross, GA 30092.

Kearney Plan Service, 1007 2nd

Avenue, Kearney, NE 68847.

Standard Digital Imaging/Stan-

dardShare - www.stan-

darddigital.com.

Construction Industry Center -

www.constructio-

nindustrycenter.com.

iSqFt - www.isqft.com.

Dodge Data & Analytics (Electro-

nic Plan Room), 3315 Central Ave,

Hot Springs, AR 71913

800-393-6343 - www.constru-

ction.com.

B. Upon receipt of Bid Docu-

ments verify that documents are

complete. Notify Architect should

the documents be incomplete.

C. Immediately notify Architect

upon finding discrepancies or

omissions in the Bid Documents.

2.04 PRODUCT / ASSEMBLY /

SYSTEMS SUBSTITUTIONS

A. No technical questions will

be answered by the Architect's

/Engineer's office(s) during the

twenty-four (24) hours immedi-

ately preceding the bid opening

time and date.

B. All products and manufactur-

ers shall be as specified in the bid

documents. Any requested

changes in products or manufac-

turers shall be submitted to the Ar-

chitect seven days prior to the bid

date. Requested changes that have

been approved will be included in

an addendum. Any requested

changes not included in an adden-

dum are to be considered as not

approved. The Owner reserves the

right to negotiate any proposed

Voluntary Alternates only with the

apparent low bidder with selection

based on the Base Bid and se-

lected Alternate(s).

C. The Architect does not intend

to issue any addenda to the bidd-

ing documents within three (3)

working days of the bid opening

time and date.

SITE ASSESSMENT

3.01 SITE EXAMINATION

A. All Bidders are required to

make a careful, close examination

of the entire building areas before

submitting a bid. See 01 1000

Summary for the schedule.

1.4 CONTRACTOR USE OF

SITE AND PREMISES

A. Arrange use of site and prem-

ises to allow:

1. Owner occupancy.

2. Use of site and premises by

the public.

B. Provide access to and from

site as required by law and by

Owner:

1. Emergency Building Exits Dur-

ing Construction: Keep all exits re-

quired by code open during con-

struction period; provide temporary

exit signs if exit routes are tempo-

rarily altered.

2. Do not obstruct roadways,

sidewalks, or other public ways

without permit.

C. Utility Outages and Shutdown:

1. Limit disruption of utility ser-

vices to hours the building is unoc-

cupied.

2. Do not disrupt or shut down

life safety systems, including but

not limited to fire sprinklers and fire

alarm system, without 7 days no-

tice to Owner and authorities hav-

ing jurisdiction.

3. Prevent accidental disruption

of utility services to other facilities.

OFFER ACCEPTANCE /

REJECTION

4.01 DURATION OF OFFER

A. Bids shall remain open to ac-

ceptance and shall be irrevocable

for a period of forty-five (45) days

after the bid closing date.

4.02 ACCEPTANCE OF OFFER

A. The Owner and Contractor

shall have the right to reject any or

all bids, which are in any way in-

complete or irregular, and to waive

any informality in any proposal.

ZNEZ A21,A23,A27,A29

 

CENTRAL COMMUNITY

COLLEGE - HASTINGS

ROOF REPLACEMENTS

INSTRUCTIONS TO BIDDERS

INVITATION

1.01 BID SUBMISSION

A. Bids signed and under seal,

executed, dated, and submitted for

the furnishing of all labor, materials,

and equipment for the Central

Community College - Hastings

Roof Replacements prior to:

1. Date: May 25, 2021.

2. Time: 2:00 p.m.

3. Place: Central Community Col

lege Board Room 80

4. Location: Grand Island, Ne

braska.

B. Offers will be opened publicly

immediately after the time for re-

ceipt of bids. The Owner will con-

sider the bids received for the fur-

nishing of said labor, materials and

equipment necessary for the proper

construction of the aforesaid proj-

ect.

C. The General, Mechanical and

Electrical, will be under one Bid. All

subcontractor quotations shall be

sent to the General Contractor.

D. Bid Security is required to be

submitted with bid proposal form.

Make payable to Central Commu-

nity College in the amount of 5% of

the Lump Sum Bid Amount. Bid

Security shall be of cashiers check,

certified check, or Bid Bond issued

by a Surety licensed to conduct

business in the State of Nebraska.

Form of Bid Bond is AIA Document

A310. Any agent signing a bid bond

on behalf of the Surety must attach

a Power of Attorney effectively evi-

dencing the agent's authority to

bind the Surety to the performance

of the Bid Bond.

E. Performance Bond: The Con-

tractor shall be required to furnish

acceptable bonds to complete the

work and pay for all labor and ma-

terials used, said bonds to be in the

amount of 100% of total amount of

the Contract. See Document A701,

Instructions to Bidders.

F. Taxes: The Contractor by vir-

tue of his contract with Central

Community College, becomes a

purchasing agent for the Owner on

their behalf and under Statute

77-2702 does not pay sales tax.

G. Insurance: Prior to the start of

the work, completed copies of the

Certificate of Insurance, AIA Docu-

ment G705 shall be submitted to

the Owner and Architect.

H. Pre-Bid Conference is manda-

tory for General Contractors.

Meeting attendance is strongly rec-

ommended for major subcontrac-

tors.

1. Date: May 12, 2021.

2. Time: 10:00 a.m.

3. Place: Central Community Col

lege - Hastings, Hall Student

Union, Franzen Room 103

4. Location: Hastings, NE.

1.02 PROJECT SUMMARY

A. Project Name: Central Com-

munity College - Hastings Roof Re-

placements

B. Project Address: 550 South

Technical Blvd, Hastings, Nebraska

68901.

C. Owner's Name: Central Com-

munity College

D. Architect's Name: Wilkins Ar-

chitecture Design Planning, L.L.C..

E. The Contract Documents,

dated May 6, 2021 prepared for the

project by Wilkins Architecture De-

sign Planning, L.L.C.

F. The work consists of replacing

roofs at three (3) separate buildings

on the Hastings campus and pro-

viding gutters and downspouts at

one (1) separate building. Roof re-

placement to be low-slope roof

with EPDM single-ply roofing mem-

brane with additional polyisocy-

anurate insulation layers. Project

also includes coordination of exist-

ing RTU and ductwork, all associ-

ated flashing and perimeter cap

flashing.

1.03 CONTRACT DESCRIPTION

A. Contract Type: A single prime

contract based on a Stipulated

Price as described in Document 00

5200 - Agreement Form.

B. Project will be constructed un-

der one general construction con-

tract.

1.04 OWNER OCCUPANCY

A. Owner intends to occupy the

Project upon Substantial Comple-

tion.

B. Schedule the Work to accom-

modate Owner occupancy.

1.05 CONTRACT TIME

A. The bidder, in submitting an

offer, accepts the Contract Time

period stated for performing the

Work. The completion date in the

Agreement shall be the Contract

Time added to the commencement

date.

1.06 WORK SEQUENCE

A. ALL WORK MUST BE COM-

PLETED WITHIN THE SCHEDULE

NOTED. The Work shall be con-

ducted in a single phase as de-

scribed in the schedule below:

B. May 12, 2021: Pre-Bid Confer-

ence at 10:00 a.m. at Central Com-

munity College - Hastings, Hall

Student Union, Franzen Room 103

May 25, 2021: Bids received

from General Contractors at 2:00

p.m.

TBD: Contractors interviews in

CCC Board Room.

June 17, 2021: Low bid contrac-

tor recommendation presented to

Board of Governors.

June 28, 2021: Contract

awarded: Start Digital Document

Submittal Service (ORACLE, Sub-

mittal Exchange) and Administra-

tive Requirements

July 5, 2021: Construction Starts

August 30, 2021: Substantial

Completion.

September 10, 2021: Final Com-

pletion.

BID DOCUMENTS AND CON-

TRACT DOCUMENTS

2.01 DEFINITIONS

A. Bid Documents: Contract Doc-

uments including Project Manual,

Construction Drawings and all is-

sued Addendums.

2.02 AVAILABILITY

A. Bid Documents may be ob-

tained from the following location:

1. Standard Digital Imaging, 4424

S 108th St, Omaha, NE 68137 (402)

592-1292.

B. Bid Document Information can

be obtained online from the fol-

lowing location:

1. Standard Digital Imaging |

Standard Share; www.stan-

dardsharev3.com. The following in-

formation can be obtained and

viewed:

a. Instructions to Bidders

b. Bid Form

c. Specifications Table of Con-

tents

d. Section 01 1000 Summary

e. Addendums

f. Construction Drawing Images

IMAGES ARE NOT FOR BIDD-

ING - FOR REFERENCE ONLY IN

ORDERING

C. A deposit in the amount of

$50.00 (made payable to Wilkins

Architecture Design Planning,

L.L.C.) will be required for each set

of bidding documents. If shipping

is required there is a non refunda-

ble amount determined and made

payable to Standard Digital Imag-

ing These checks are to be sent to

Standard Digital Imaging prior to

receipt of documents. The deposit

will be returned in full only if a qual-

ified bid is submitted and the Bid

Documents are returned within fif-

teen (15) days of the bid determina-

tion, or if the Contractor decides

not to submit a Proposal and the

Bid Documents are returned with

seven (7) days prior to the bid

opening.

D. ALL BID DOCUMENTS

SHALL BE RETURNED to the of-

fice of Wilkins Architecture De-

sign Planning, L.L.C., 2908 West

39th Street, Suite A, Kearney,

Nebraska, 68845.

2.03 EXAMINATION

A. Bid Documents may be exam-

ined at:

Lincoln Builders Bureau, 5910 S.

58th Suite #C, Lincoln, NE 68516.

Omaha Builders Exchange, 4255

S 94th St., Omaha, NE 68127.

Columbus Area Chamber of

Commerce, 753 33rd Ave., Colum-

bus, NE 68602-0515.

Hastings Builders Bureau, 301

South Burlington, Hastings, NE

68902.

Builders Plan Service, 309 West

2nd, Grand Island, NE 68801.

Reed Construction Data, 30

Technology Drive So. Suite 500,

Norcross, GA 30092.

Kearney Plan Service, 1007 2nd

Avenue, Kearney, NE 68847.

Standard Digital Imaging/Stan-

dardShare - www.stan-

darddigital.com.

Construction Industry Center -

www.constructio-

nindustrycenter.com.

iSqFt - www.isqft.com.

Dodge Data & Analytics (Electro-

nic Plan Room), 3315 Central Ave,

Hot Springs, AR 71913

800-393-6343 - www.constru-

ction.com.

B. Upon receipt of Bid Docu-

ments verify that documents are

complete. Notify Architect should

the documents be incomplete.

C. Immediately notify Architect

upon finding discrepancies or

omissions in the Bid Documents.

2.04 PRODUCT/ASS

MBLY/SYSTEM SUBSTITUTIONS

A. No technical questions will

be answered by the Architect's

/Engineer's office(s) during the

twenty-four (24) hours immedi-

ately preceding the bid opening

time and date.

B. All products and manufactur-

ers shall be as specified in the bid

documents. Any requested

changes in products or manufac-

turers shall be submitted to the Ar-

chitect seven days prior to the bid

date. Requested changes that have

been approved will be included in

an addendum. Any requested

changes not included in an adden-

dum are to be considered as not

approved. The Owner reserves the

right to negotiate any proposed

Voluntary Alternates only with the

apparent low bidder with selection

based on the Base Bid and se-

lected Alternate(s).

C. The Architect does not intend

to issue any addenda to the bidd-

ing documents within three (3)

working days of the bid opening

time and date.

SITE ASSESSMENT

3.01 SITE EXAMINATION

A. All Bidders are required to

make a careful, close examination

of the entire building areas before

submitting a bid. See 01 1000

Summary for the schedule.

1.4 CONTRACTOR USE OF SITE

AND PREMISES

A. Arrange use of site and prem-

ises to allow:

1. Owner occupancy.

2. Use of site and premises by

the public.

B. Provide access to and from

site as required by law and by

Owner:

1. Emergency Building Exits Dur-

ing Construction: Keep all exits re-

quired by code open during con-

struction period; provide temporary

exit signs if exit routes are tempo-

rarily altered.

2. Do not obstruct roadways,

sidewalks, or other public ways

without permit.

C. Utility Outages and Shutdown:

1. Limit disruption of utility ser-

vices to hours the building is un-

occupied.

2. Do not disrupt or shut down

life safety systems, including but

not limited to fire sprinklers and fire

alarm system, without 7 days no-

tice to Owner and authorities hav-

ing jurisdiction.

3. Prevent accidental disruption

of utility services to other facilities.

OFFER ACCEPTANCE/REJE

CTION

4.01 DURATION OF OFFER

A. Bids shall remain open to ac-

ceptance and shall be irrevocable

for a period of thirty (30) days af-

ter the bid closing date.

4.02 ACCEPTANCE OF OFFER

A. The Owner and Contractor

shall have the right to reject any or

all bids, which are in any way in-

complete or irregular, and to waive

any informality in any proposal.

ZNEZ A27,A29,My5,M7

 

Tags

Be the first to know

* I understand and agree that registration on or use of this site constitutes agreement to its user agreement and privacy policy.

Related to this story

Most Popular

Get up-to-the-minute news sent straight to your device.

Topics

Breaking News